Casper’s West Belt Loop Road Wins Wyoming Engineering Society Award

June 18, 2016

Share this article

West Belt Loop Road in Wyoming, a highway project poster with aerial views and inset photos of construction sites

Wyoming Engineering Society (WES)

The Wyoming Engineering Society (WES) has recognized Wyoming Department of Transportation’s West Belt Loop project as the co-winner of its 2016 President’s Project of the Year award. WES gives this honor annually for outstanding engineering or surveying projects used by and benefitting people of the state.


The project applicants were Wyoming Department of Transportation (a project partner and Owner), and AVI Professional Corporation who completed the engineering design for the project.


Wyo. Highway 257 (West Belt Loop Road) connects Wyo. Highway 220 to U.S. Highway 20-26 and is approximately 7.5 miles in total length. The roadway consists of two (2) bridges and numerous box culverts and stock crossings. Construction for this bypass consisted of two (2) phases. Phase 1 construction began in 2013 and consisted primarily of roadway grading, bridge construction, and the re-alignments of both Robertson Road and Poison Spider Road. The entire road bed was prepared from the approximately three(3) million cubic yards of material excavated throughout the project with the majority of the material being generated from the “Big Cut” area just north of the Bridge spanning the North Platte River.


Phase 2 of the project began in the fall of 2014 and consisted of placing concrete surfacing along the constructed West Belt Loop roadbed, construction of the Oregon Trail Scenic and interpretive parking area, signing and striping, along with reconstruction of a small portion of US 20-26 to improve storm drainage. The construction cost for both phases of the Casper West Belt Loop project was approximately $36 million. The project was completed on December 1st, 2016.


http://trib.com/news/state-and-regional/casper-s-west-belt-loop-receives-engineering-award/article_0d6a7911-be9b-5d95-8963-66ffe23039af.html?utm_medium=social&utm_source=email&utm_campaign=user-share


Bulldozers and dump trucks working in a dusty open-pit mine on a rocky hillside
Construction workers on cranes installing a large steel bridge beam under a blue sky
Construction workers in orange vests pouring concrete at a site with wooden forms and machinery

Recent Posts

Seven people standing shoulder to shoulder outside a building, posing for a group photo.
August 29, 2020
Learn how AVI supports the community through volunteering. Join us in making a difference with Meals on Wheels & Larimer County initiatives.
Annotated site map with red, blue, and green route lines across a development plan.
June 18, 2019
Learn about the High Plains Road Corridor Study by AVI, aimed at improving transportation in Cheyenne. Share your input today!
Fossil Creek Trail sign with thank-you notice on a fence, with a bicycle partially visible on the right.
December 10, 2018
Explore AVI's surveying expertise for the Fossil Creek Trail project. Contact us for tailored solutions today!
Two workers in hard hats view large black-and-white wall renderings beside a stairway
August 14, 2018
Explore the new Loveland Campus, honoring history with modern design. Contact AVI for your engineering & planning needs.
Two hunters posing by pickup truck tailgate with hunted ducks laid out in the open bed
June 18, 2018
AVI offers civil engineering, planning & surveying services. Contact us for innovative project solutions!
Two-story beige apartment building with balconies and a parking lot in front
March 8, 2018
Learn about the Whitney Road Corridor Study, focusing on civil engineering & urban planning. Share your feedback today!
Two smiling people wearing white helmets pose for a photo outdoors while someone takes their picture.
June 29, 2017
Learn about the Larimer County office building project in Loveland, CO, starting July 5. Contact us for more details!
Two people stand on a damaged bridge over rushing water beside a road closure and orange cones
June 21, 2017
Celebrate the new Glen Haven Bridge with the community. Join us in marking this milestone in flood recovery and improved access.
Two-story tan apartment building with balconies and a central entrance under a blue sky
By Lydia Chiu February 18, 2017
AVI specializes in civil engineering & planning. Contact us to enhance community development with innovative projects.
Rocky cliffside construction site with red barriers, excavator, and a dirt road
By Lydia Chiu January 28, 2017
Stay updated on the Larimer Co. Road 31 rockfall scaling project. Contact us for expert civil engineering solutions!
Show More