High Plains Road Corridor Study

June 18, 2019

Share this article

Site map with red, blue, and green route lines over a detailed plan drawing

The Cheyenne Metropolitan Planning Organization (MPO) a long range transportation planning entity in coordination with the County and WYDOT have contracted with AVI, a local Cheyenne engineering and planning firm to study potential alignments for a future High Plains Road Corridor. 


The need for an east west connector between College Drive and Terry Bison Road has become more evident in recent years as adjacent developments on I-25 and U.S. 85 (South Greeley Highway) have built up like the Cheyenne Logistics Hub at Swan Ranch and Stubbs and Stubbs Oilfield Construction, respectively. Steady development at the Rail Park and growth in a number of industrial companies has also been accompanied by high tech industries that are also moving into the Laramie County the Cheyenne LEADS Business Parks. This growth has increased pressure to complete the South Cheyenne road network to alleviate congestion on the other major roads and accommodate growth and future development in southern Cheyenne.


The Street Network Master Plan, South Cheyenne Streets completed and adopted the City and County Governing Bodies in 2004, recommended that a conceptual High Plains Road connect at a future interchange on I-25 which is now in place.  It was also recommended that this future roadway follow the terrain and section lines and then intersect with the other collectors or arterials including Parsley, Division, South Greeley Highway and Avenue C. Subsequent adopted plans including the County and City version of Long RangeTransportation Plan in PlanCheyenne 2006 and update in 2014 identify the need for High Plains Road to serve future development. 


The primary purpose of the project is to create a comprehensive and realistic planning document that is sensitive to the current function and property owners, serves all transportation users, and is adaptable to future developments in the area. The end result of this project will include the following goals:


  • Development of a 35% conceptual road design for High Plains and recommendation on a preferred alignment and future “footprint” of the corridor
  • Accommodate the needs of the existing landowners and future roadway users
  • Provide a safe roadway of all users.


Your ideas and comments are important, as they will have a direct impact on the decisions made about what future development will occur and what the roadway network will look like. Thank you very much for your time and comments. Online comment card available at https://www.surveymonkey.com/r/HighPlainsInitial

Recent Posts

Seven people standing shoulder to shoulder outside a building, posing for a group photo.
August 29, 2020
Learn how AVI supports the community through volunteering. Join us in making a difference with Meals on Wheels & Larimer County initiatives.
Fossil Creek Trail sign with thank-you notice on a fence, with a bicycle partially visible on the right.
December 10, 2018
Explore AVI's surveying expertise for the Fossil Creek Trail project. Contact us for tailored solutions today!
Two workers in hard hats view large black-and-white wall renderings beside a stairway
August 14, 2018
Explore the new Loveland Campus, honoring history with modern design. Contact AVI for your engineering & planning needs.
Two hunters posing by pickup truck tailgate with hunted ducks laid out in the open bed
June 18, 2018
AVI offers civil engineering, planning & surveying services. Contact us for innovative project solutions!
Two-story beige apartment building with balconies and a parking lot in front
March 8, 2018
Learn about the Whitney Road Corridor Study, focusing on civil engineering & urban planning. Share your feedback today!
Two smiling people wearing white helmets pose for a photo outdoors while someone takes their picture.
June 29, 2017
Learn about the Larimer County office building project in Loveland, CO, starting July 5. Contact us for more details!
Two people stand on a damaged bridge over rushing water beside a road closure and orange cones
June 21, 2017
Celebrate the new Glen Haven Bridge with the community. Join us in marking this milestone in flood recovery and improved access.
Two-story tan apartment building with balconies and a central entrance under a blue sky
By Lydia Chiu February 18, 2017
AVI specializes in civil engineering & planning. Contact us to enhance community development with innovative projects.
Rocky cliffside construction site with red barriers, excavator, and a dirt road
By Lydia Chiu January 28, 2017
Stay updated on the Larimer Co. Road 31 rockfall scaling project. Contact us for expert civil engineering solutions!
Exterior of Horseouth Area building with green roof, brick walls, and glass entrance on a sunny day
By Lydia Chiu September 27, 2016
AVI offers civil engineering, planning & surveying services. Contact us for innovative solutions tailored to your project needs.
Show More